Whether to install the preview version on the production station, and how to choose between Release Candidate and formal version
Do not install the preview version on the production server. The Release Candidate (candidate version) is located at the last public verification before the official version packaging, the official's appeal is usually written in the title: to let testers verify the final installation package. The production server needs the formal version that has passed this verification and the security fixes for the released versions.
At which step is the candidate version?
From the recent Joomla announcement list, you can see two parallel threads: one is the 6.2 Release Candidate, created on September 29, 2026, and its purpose is written as providing the final installation package for testing; the other is the security and bug fix release of 6.1.4 and 5.4.9, covering both the 5.x and 6.x series. These two threads correspond to two types of people: the former is aimed at users willing to bear the verification cost, and the latter is aimed at all sites that need security fixes.
Within a healthy release rhythm, the candidate version and security fix are complementary rather than替代 relationships. The candidate version resolves the question of whether new features are available, while the security fix resolves the question of whether there are known risks with the currently accessible version. The scheduling of production stations should follow the second clue.
| Version type | Who is it aimed at? | Production station strategy | Main risk |
|---|---|---|---|
| Candidate version (RC) | Validator | Run only in pre-release environment | Changes are not finalized, may roll back |
| Official version | All users | Upgrade after backup and windowed upgrade | The upgrade itself needs verification |
| Security repair version | Sites still under support | Prioritize arrangement | Exposure during the repair window period |
Why it is not suitable to go directly into production
The definition of the candidate version is that it will change. Usually, feedback from tests will be absorbed and modifications will be made between the candidate version and the formal version, which brings two specific problems.
The first is that the changes in data format and structure may not be finalized. The upgrade of the content system often comes with database scripts, and when the script fails halfway through, the site will stop in a halfway upgrade state. Installing the candidate version in advance is equivalent to putting the risk of such changes into real data execution.
The second issue is that the rollback path is not clear. Sites that have installed the candidate version need to be rolled back to the official version and need to confirm whether the structure has been changed; if it has been changed, it must rely on backup recovery rather than simple version downgrade. The fewer recovery points in the production site, the better, and this step does not need to be actively increased.
The correct usage is to arrange the candidate version in the pre-release environment: run the upgrade script with a copy of the production data, check the column structure, template rendering, and plugin compatibility, and feedback the findings. This way, you can get the benefits of early verification without exposing the online environment to undrafted changes.
Which branch to upgrade first when running dual version lines in parallel?
When multiple maintenance lines exist at the same time, the judgment order is as follows: First, confirm whether the current version line you are on is still being actively supported; then, see if the fixed version in the announcement covers this line; if the old line on this site only takes security patches and does not take feature updates, then the upgrade target should be determined according to the security line, and do not inadvertently cross over to the feature line. Leave the upgrade of major versions to independent maintenance windows and schedule them separately from security repairs so that it can be determined which step caused the problem when an issue occurs.
The deployment methods of AnQiCMS cover Baota panel, command line, and Docker images. The upgrade action in the Docker scenario is relatively controllable: changing the image tag, restarting the container, and can directly roll back to the original tag in case of failure. For sites deployed via panel or command line, rolling back depends on the backups made in advance, which is why backups should be placed before the upgrade action rather than after.
Make a backup and set a rollback point before the upgrade
The system supports data and static file backup and recovery, use this feature before upgrading, at least do three things: first, complete a backup before making changes and take the upload directory and static files along with it, just backing up the database is not enough to restore the modified templates and images; second, note the current version number and the target version number of this update, it is convenient to compare the structural changes in the update records; third, leave verification steps for rollback, after recovery, you should be able to open one item of the front-end page and one item of the back-end list, rather than just see the process started.
Don't slack off in the time window. After the release of the candidate version for a few days, the formal version itself may still have undetected issues. Scheduling the upgrade after the announcement, rather than on the day of the announcement, allows the first batch of feedback to expose obvious problems; conversely, the security announcement confirms that the patches that have been exploited in the wild are not applicable to this experience, and in such cases, the upgrade should be completed as soon as possible after the backup is completed.
Common questions
Question: I just want to see the new features, can I install the candidate version on the test site?
Answer: Yes, the test site is exactly where it is needed. Make a backup before installing it as well, which is convenient for comparing the test results.
Question: Should I follow up immediately on the day of the formal version release?
Answer: The stable version for non-security classes can be waited for one or two workdays; the version with security fixes should be upgraded as soon as the backup is ready.
Question: How can I go back to the stable version after installing the candidate version?
Answer: First, check if the structure has been changed by the upgrade script of the candidate version. If it has been changed, restore from the backup and install the stable version, if not, upgrade directly to the same number stable version.