Joomla 5.x routine bug fixing support ends on October 13, 2026, should the existing sites upgrade to 6 or stay put?
After entering the stage of issuing only security patches, how should a website decide whether to upgrade to a major version or continue to stay? The Joomla official roadmap has provided clear milestones: regular defect repair support for the 5.x series ends on October 13, 2026, and only security patches will be issued between October 13, 2026, and October 12, 2027; while the 6.0 series was released as early as October 14, 2025. This is not a question of 'must move today', but an opportunity to put maintenance costs on the table: neither path is fatal, but choosing the wrong rhythm is fatal.
The official schedule actually outlines three stages
Within the regular support phase, defects (functional anomalies, compatibility bugs) and security issues will be fixed; after entering the security repair phase, functional issues are no longer considered problems, and the site must operate with known bugs for a full year; after the first phase, even security patches will stop being issued, and staying behind will become running without a parachute. The boundaries of the three stages are all date-driven, which means the judgment window is announced in advance, and decisions can be made calmly, but they cannot be avoided.
What must the留守 path accept?
Choose to stay with the 5.x team, usually for reasons such as custom templates and extensions not yet verified for the 6.x behavioral changes. The cost of staying put should be listed specifically: functional defects can only be circumvented by yourself (for example, edge issues with forms, category outputs will no longer be repaired by anyone); third-party extensions that depend on the 6.x evolution will only become less and less compatible with the 5.x side; patches for security fixes still need to be applied on time, and no operation can be saved during the maintenance process. Staying put is not 'not maintaining', but 'maintaining with the same diligence, with less return.'
The cost of the upgrade path
The cost of upgrading to version 6 is concentrated in one-time transformation: template and overlay style regression, extension compatibility replacement, and interface retesting for deep integration. For sites with a large amount of transformation, it is recommended to follow the standard actions - first run the main process in the test environment completely, make a full backup of data and static files before upgrading to keep a fallback position, choose the off-peak period for production upgrade, and inspect each item on the list after completion. This set of actions is version-independent, and any major version migration should be arranged in this way.
| Dimension judgment | Tend to stay at 5.x | Tend to upgrade to 6.x |
|---|---|---|
| Custom surface | Many template and code changes, short-term no human resources regression | Essentially use standard capabilities, the cost of modifying the template is low |
| Extension dependency | Critical extension not verified for 6.x compatibility | Few dependencies or already compatible version |
| Operations rhythm | Can stick to monthly security patch updates | Hope to make one-time transformation for long-term normal maintenance |
| Risk preference | Accept known functional defects and run with issues | Accept temporary freezing of new features during the upgrade period |
Support rhythm itself is also a selection variable
Apart from existing decision-making, this schedule also contains a hint: the content management system 'how often to release a fix, whether the fix covers the version you have installed' should be included in the selection verification items.Align with the recent pace of our own product AnQiCMS (AnQi CMS): v3.6.6 (October 8, 2026) focused on fixing two high-risk issues, SQL injection in list sorting parameters and the possibility of forged login credentials during site switching. The login credentials for site switching are now changed to a one-time ticket mechanism. The upgrade prompt also requires the rotation of site signature keys and the modification of the administrator password - from identifying the problem to releasing the fix, only one day passed, and the fix was clearly applied to the current version.The speed of the closed loop of 'problem → patch → action' determines whether a system is worth long-term trust, not the size of the version number.
Common questions
One year left in the security repair phase, can we delay the upgrade to the last minute?Can, but the workload of the upgrade will not be reduced due to the delay; the later the upgrade, the more reference records of others' pitfalls and the less buffer for your own transformation, both ends need to be considered.
Will the old content be lost after upgrading to version 6?Major version upgrades do not change the content data structure, what truly needs to be monitored is template compatibility and extension behavior, and the content itself should be backed up in full before taking action.
How do you know whether the site depends on 5.x or 6.x?Use the official pre-upgrade check tool to list the extension and template list, mark each item with 'has compatible version / needs replacement / can be abandoned', and it will be clear after marking.