The two branches of the same program released at the same time as a secure version, which branch the site follows depends on what.
Two branches of the same program are released as secure versions on the same day, and which one the site follows depends on the support status of your own branch, not the version number. For example, Joomla released 6.0.2 and 5.4.2 simultaneously on January 31, 2026, and the official statement is that these are security and error repair versions for both the 5.x and 6.x series, and two dates were written separately for 5.4.x: error repair support until October 13, 2026, and security patch support until October 12, 2027.When judging the action of following the version, first look at these two lines, and then look at the content of the repair item.
Two versions on the same day, indicating the maintenance structure
A project maintains two or more branches at the same time, usually meaning that the previous major version still has a relatively large number of existing sites, and the official cannot only serve the latest branch. Under this structure, the content of the two versions released on the same day is not the same: the version of the new branch often includes both feature fixes and security fixes, while the version of the old branch only moves back the security fixes.
Therefore, the matter of
First look at the branch of your own site, then look at the date
The judgment sequence of the site can be fixed: first confirm the current major and minor versions, then check the official support calendar, and finally compare the two deadline lines. After the error correction deadline, minor issues in daily use will no longer be handled by the official, but security vulnerabilities will still be patched; after the security repair deadline, even patches will not be available, and new vulnerabilities can only be temporarily covered by external protective measures.
| Support status | Error correction | Security repair | How to arrange the site |
|---|---|---|---|
| Both support periods are | there is | there is | Follow the regular window version |
| Past the error correction deadline | None | there is | Only follow the security version, and bypass functional issues yourself |
| Past the security repair deadline | None | None | Urgently schedule the upgrade, tighten access during the downtime |
| This branch has never been covered by this series | None | None | Confirm the actual repair range given by the official |
Taking the date of Joomla 5.4.x as an example, from October 13, 2026, to October 12, 2027, this branch will still receive security patches, but will no longer receive error fixes; this period is suitable for scheduling the upgrade window, rather than waiting passively after the second line.
What to read when following the version, not just the version number
The version number only indicates that there is an update, whether to handle it immediately depends on whether the fix affects your usage. Every description in the official update record is worth reading, and the judgment logic is very simple: have I opened this entry to the outside, have I customized this layer, and do I depend on the behavior that has been fixed.
The method of our own system can be directly compared. AnQiCMS v3.6.6 is a security version update, and the update record clearly states two high-risk issues: SQL injection in list sorting parameters, and the login credentials of site switching can be forged.The corresponding measure is to change the sorting parameters to a strict identifier whitelist and replace the cross-site jump login with a one-time ticket issued by the server, which is valid for a fixed period of time and invalid after use.This description is more useful than the version number - if the site does not use multi-site switching login, the risk is smaller; if the background list page is accessible to the outside, this should be prioritized.
The update log for the secure version will also include upgrade requirements. The prompt for v3.6.6 clearly states: If the site has been hacked, simply upgrading is not enough to clear the sessions that the attacker has already obtained. It is necessary to also rotate the keys used for login signatures on all sites and change all administrator passwords. This requirement cannot be omitted; omitting it is the same as leaving the entrance unchanged.
How do you arrange the upgrade window?
Schedule three things in order in the window: first, make a complete data backup and leave a place for rollback; then complete the upgrade during off-peak hours, check whether the fixes in the update record have taken effect one by one; finally, deal with login credentials and account status, confirm that the administrator password and the site key have been updated. There are usually several months between the two deadline lines, which is enough time to complete the above three steps, and there is no need to rush them into one day.
Common questions
Two branches released the security version on the same day, does this mean that the old branch is about to stop?No. The release on the same day means that both branches are still being maintained, and the time to stop is based on the two deadlines on the official support calendar.
Can we only follow the security patches and not the feature updates?After the deadline for error fixes, this is what had to be done. Custom changes need to be maintained until the completion of the major version upgrade when feature patches are no longer provided.
If the security fix deadline has passed but the upgrade hasn't been done yet, how can the risk be temporarily reduced?Narrow the exposure to the outside world: close unnecessary interfaces and backend entries, limit the network range of executable management operations, and increase the backup frequency to ensure a quick rollback in case of problems. Temporary measures do not replace upgrades.
How do you know if a certain security version affects your site?Read the description of the fixed items in the update record, and compare them one by one to see if you use this entry or this feature. Functions not used can be delayed, and entries used should be arranged in priority.
Do I need to back up before upgrading?Yes. Upgrading may trigger data structure adjustments and template compatibility issues. A backup in advance can complete the rollback within a controllable time, and it can also restore the static files to their original position.