Feature preview

Feature Introduction

How to arrange the update rhythm of scheduled publishing, does it help with indexing?

Scheduled publishing does not directly change the ranking, its role is to fix the update rhythm: determine the frequency according to the content production capacity, pick the time according to the crawling rules, and then cooperate with link push and sitemap to shorten the time for new addresses to be discovered. This article provides scheduling methods, two places that are easy to miss in the document status flow, as well as the verification list on the day of launch.

Inclusion Content operation Schedule publishing

Feature Introduction

How should the update rhythm be arranged for scheduled publishing, does it really help with inclusion? Its point of action is on the rhythm, not on the weight. Scheduled publishing makes updates occur at a predictable time, so the crawling program has a stable return pattern; AnQiCMS's time factor - scheduled publishing supports setting the publication time for content, so that drafts can be queued up after they are written, without waiting for someone to stay behind the scenes and submit articles one by one. What really determines how quickly new content is seen is still the discovery path: link push, active push, and site map three channels, scheduled publishing is responsible for the output time itself.

What scheduled publishing does not solve is not the ranking issue

Separate two things first: scheduling release manages when the content goes live to the public, while crawling manages when the crawling program discovers this address. No matter how neatly the former is arranged, if the new address has not entered the sitemap and has not been actively pushed, crawling still has to wait for the internal links to slowly bring it out. So the correct understanding is: scheduled release solves the uniform distribution of production capacity, while push and sitemap solve the speed of being discovered, both of which are meaningful when used together.

In reverse, pushing all weekly manuscripts to go online at the same time point will cause a batch of dozens of new addresses to appear on one day, with the rest of the six days showing no change in the zigzag update. The frequency of crawling and follow-up will adjust with this zigzag, and the actual effect is usually not as good as stable small batches.

How to determine frequency: by capacity rather than by wish.

The upper limit of frequency is determined by two hard constraints: the number of manuscripts that can be written and reviewed, as well as the number of new topics that can be undertaken within the site. It is recommended to first locate your capacity level with the table below, and then decide the queuing density.

Tier Weekly new content volume. Applicable situations. Queuing method.
Starting point. Three to five articles. Single person maintenance, narrow topic selection. Every other day, fixed in the morning
Routine Seven to fourteen articles With a small team, can be divided according to the column One to two articles a day, early and late staggered
Batch More than twenty articles With a material library and batch import Multiple articles a day, rotating by column

Once the position is determined, do not use short content to make up for the lack of copy. The repeated paragraphs brought by batch page layout will drag down the overall judgment of the site, and the meaning of rhythm will be lost.

How to choose the time period: align with the crawling rhythm

The goal of time selection is simple: let the content take effect during the active period of crawling. If the background log shows that there are many visits during the day, schedule the release time for late at night, so that the new address can only be seen the next day, and the push for the day cannot be initiated. The conventional practice is to make the main articles take effect one to two hours before the active period of crawling, leave a manual review window, and also allow the address to be handed over on the same day.

In scenarios involving multilingual or multi-site environments, it is important to pay attention to time zones: the effective time of the same schedule at different sites is not equivalent, and it needs to be arranged separately for each site's target audience.

Two easy-to-miss points in the document status flow.

The document status of AnQiCMS is divided into formal documents, drafts, pending release, and recycling bin. The two points that are most likely to cause problems are:

The first is the draft preview. The draft link with preview=true is only used for preview and is not the official address. If the preview link is mistakenly taken as the main address for submission or sharing, a jump convergence needs to be performed later, otherwise the same content will appear at two entry points.

The semantics of deletion. Formal document deletion is to move it to the recycle bin instead of physical deletion. If the content in the recycle bin is re-imported by the cleanup tool, there may be a situation where it has been decided to go offline but still appears in the site map. The manuscripts that are no longer retained need to confirm the disposal results in the recycle bin.

The verification list on the day of launch

  • Search for this article by title and confirm that it can be found and is in the status of formal document;
  • Check if this address has already appeared in the site map, if not, wait for the next round to generate;
  • Perform a link push or active push for the new address on that day, and note the submission return;
  • Check if the internal links in the text point to effective addresses rather than preview addresses or old columns;
  • Review the crawling and indexing data from the next day to confirm whether the scheduling needs to be adjusted for frequency or time slot.

Common questions

Is it better to update more frequently?No. The density should match the production capacity and the scope of topics, as anything beyond that will only dilute the quality of individual articles.

Do I need an additional plugin for scheduled publishing?In AnQiCMS, it is part of the built-in time factor capability, which takes effect directly in the document status flow and no additional component needs to be installed for this.

Will changing the publication time affect the addresses already indexed?If the address does not change, it is not worth talking about re-inclusion; only when the column or pseudo-static rules are changed together, do you need to add redirects.

How often do you check the effect?It is recommended to compare the amount of crawling and the number of new included pages on a weekly basis, adjust the schedule when the expected deviation occurs for two consecutive weeks, and the daily fluctuation is not enough to be a basis for decision-making.

Related functions

Preview

To what extent can the AI writing of CMS be automated, from topic selection to image matching?

The AI capabilities in CMS for generation, editing, metadata, and materials have different levels of automation: AI writing can produce a draft, automatic tagging and TDK can fill in metadata during article creation, and automatic title image matching can solve the problem of image matching but does not take on fact-checking. The process can be reused, but fact verification and content review cannot be omitted. This article gives the boundaries of automation and the points of human oversight by stage.

Preview

What can content models and custom fields do, and how to design column structures without going back to the drawing board

Content models determine what fields a type of content has and how it is displayed, and custom fields take out differentiated information such as product parameters and case data. The column structure should be modeled according to the information structure rather than the menu grouping, otherwise, the fields need to be reset and the headers of bulk imports need to be rearranged when expanding the columns. This article provides the sequence for modeling judgment, three common errors, and the approach of using state chains and import functions to follow up on subsequent content.

Preview

The content station wants to do member grouping and permission stratification, how to implement user groups and VIP

The difficulty of implementing member grouping for a content site lies in the classification of content side, not the permission switch itself: first divide the content into several levels according to the visible range, then define the corresponding relationship between user groups and VIPs, and then discuss orders and distribution. AnQiCMS's user management and VIP grouping can set access permissions for different user groups, and work with custom fields, order management, and financial management to land.